Alaska Public Media © 2025. All rights reserved.
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations

Preliminary Engineering Underway For Susitna Watana Dam

Preliminary engineering is underway for the proposed Susitna Watana hydro electric dam.  The state has hired Colorado based MWH Global to develop designs for the project, which would provide rail belt power.

Listen for the full story

Download Audio

Dan Bross is a reporter at KUAC in Fairbanks.